![]() |
Virgin Trains - Printable Version +- Forum | Merseyside Dennis Dart Website (http://dartslf.com/forum) +-- Forum: Other Transport (/forumdisplay.php?fid=9) +--- Forum: Railways (/forumdisplay.php?fid=10) +--- Thread: Virgin Trains (/showthread.php?tid=151) |
RE: Virgin Trains - wirralbus - 14/05/2015 09:53 There will be the possibility of anglo Scottish services being diverted via Edge Hill instead of Manchester or Warrington , which gives some more operational flexability as well in the future RE: Virgin Trains - T42 PVM - 05/06/2015 16:11 Just been watching Youtube and an Advert came up involving a Virgin Train on Platform 7 at Liverpool Lime Street RE: Virgin Trains - wirralbus - 07/06/2015 08:58 The problems at Warrington (noted in the ATW Thread) are also affecting Virgin services and there is a rail replacement bus / coach service in operation between Warrington and Wigan. RE: Virgin Trains - St Helens Rider - 07/06/2015 10:11 Times like these that the electrified Chat Moss route becomes very useful RE: Virgin Trains - wirralbus - 07/06/2015 20:59 I agree but some times if it isnt planned it just displaces staff which can cause more disruption when traincrew are no longer in the right place . Everybody hates road replacement transport but sometimes its best for the operations staff . RE: Virgin Trains - wirralbus - 01/07/2015 17:56 Sounds like absolute chaos at Manchester Piccadilly tonight , with services stopping short at Stockport or Wilmslow , this is caused by OHLE fault . RE: Virgin Trains - childwallblues - 02/07/2015 16:33 (01/07/2015 17:56)wirralbus Wrote: Sounds like absolute chaos at Manchester Piccadilly tonight , with services stopping short at Stockport or Wilmslow , this is caused by OHLE fault .Not just Piccadilly. RE: Virgin Trains - wirralbus - 02/07/2015 21:19 (02/07/2015 16:33)childwallblues Wrote: Not just Piccadilly. I agree it was more than just Piccadilly suffering yesterday but just that one incident at Slade Lane had repercussions in all directions , its a long time since i saw delays of such magnitude though. RE: Virgin Trains - childwallblues - 29/07/2015 07:09 (24/04/2015 05:13)childwallblues Wrote: 390050 is the first of the 21 x 9 car units to be modified to increase the standard class accommodation. First class carriage G has been downgraded to standard, fitted with 2+2 seating and re-lettered as carriage F. The work is being done at Oxley Depot and the unit is oos for a week. Travelled on 390040 last week which has also been modified. RE: Virgin Trains - gka472l - 29/07/2015 12:25 (29/07/2015 07:09)childwallblues Wrote: Travelled on 390040 last week which has also been modified. There's at least 10 done, off the top of my head, 390016/20/40/42-47/49/50, think all to be done by September HTH |