Arriva's Cost Cutting - Printable Version +- Forum | Merseyside Dennis Dart Website (http://dartslf.com/forum) +-- Forum: Buses (/forumdisplay.php?fid=1) +--- Forum: Local Bus Scene: North West and Wales (/forumdisplay.php?fid=2) +--- Thread: Arriva's Cost Cutting (/showthread.php?tid=1176) |
RE: Arrivas Cost Cutting - Barney - 03/07/2016 12:43 (03/07/2016 12:38)T42 PVM Wrote: Their due this summer If and when the new deckers arrive for Liverpool depots will they be MMC's? Other areas of the Arriva empire are now receiving MMC's rather than the old Enviro400 design. RE: Arrivas Cost Cutting - mr t - 03/07/2016 12:46 Whenever they turn up the vehicle pvrs and staff have still been reduced. And instead of having to replace nearly 100 vehicles it's only a small chunk having to be ordered instead to satisfy the original actual requirements RE: Arrivas Cost Cutting - RedPanda - 03/07/2016 13:20 (03/07/2016 12:43)Barney Wrote: If and when the new deckers arrive for Liverpool depots will they be MMC's? Other areas of the Arriva empire are now receiving MMC's rather than the old Enviro400 design. They should be MMC's if they're brand new ADL 400's as the old design finished last year RE: Arrivas Cost Cutting - SK15 GZG - 03/07/2016 14:27 (03/07/2016 12:43)Barney Wrote: If and when the new deckers arrive for Liverpool depots will they be MMC's? Other areas of the Arriva empire are now receiving MMC's rather than the old Enviro400 design. Yes they will be MMCs but I don't know when they're arriving. The order is for around 50 buses with around half of the order being for Green Lane and the other half due for Speke RE: Arrivas Cost Cutting - trixmax2000 - 03/07/2016 19:35 (03/07/2016 12:05)mr t Wrote: I know there has been quite a few across GM which I dont pay attention too including TFM contracts which have all been lost over the year. Dont know if it will include Chester then, Winsford seems to have lost a few vehicles/services too forgot about that one. the 79/79c saved 3 buses but the 110 service as had a bus added into the allocation so were as there was only 2 min recovery they now drop back at Warrington RE: Arrivas Cost Cutting - H101GEV - 06/07/2016 18:24 (03/07/2016 02:43)mr t Wrote: Speke I'm sure the 699 PVR hasn't been reduced. Still should be a total PVR of 9 with 5 used during the off-peak period on weekdays. The timetable for September 2016 appears virtually identical to what it was when I was at uni. Overall, Speke's PVR hasn't actually gone down anyway because the 79 PVR was increased by two buses at the end of last summer. IIRC, there were other routes which had a bus or two added to the PVR to increase reliability (was the 10/10A one?) so it's not necessarily a net reduction of 5 buses at each depot. RE: Arrivas Cost Cutting - RedPanda - 06/07/2016 20:24 (06/07/2016 18:24)507009 Wrote: I'm sure the 699 PVR hasn't been reduced. Still should be a total PVR of 9 with 5 used during the off-peak period on weekdays. The timetable for September 2016 appears virtually identical to what it was when I was at uni. The 10 was reduced from 5 buses to 4 per hour. I think the 10A remains as it was. RE: Arriva's Cost Cutting - Train Man - 06/07/2016 21:50 As an aside, still talking Arriva here but the conducterless trains is bound to be part of the cost cutting measures. RE: Arriva's Cost Cutting - T42 PVM - 06/07/2016 22:02 The 10 was reduced some time ago now, Wythenshawe have lost 4 School Contracts and gained only 1 so that should release a DLP or 2 RE: Arriva's Cost Cutting - FC Pictures - 07/07/2016 10:34 (06/07/2016 22:02)T42 PVM Wrote: The 10 was reduced some time ago now, Wythenshawe have lost 4 School Contracts and gained only 1 so that should release a DLP or 2 So Another heap or two heading this way instead of to Barnsley |