East Coast - NK07 FZG - 03/06/2012 11:22

Class 91110 has been renamed 'Battle of Britain Memorial Flight' and painted into a new commemorative livery as seen here at York Railfest 2012.


East Coast - wirralbus - 28/06/2012 16:54

This is general message sent out by Nationalrail website .

Flooding and a landslip are causing disruption near Berwick-upon-Tweed and flooding is also causing disruption between Durham and Newcastle.


Because of this, the following changes will apply until further notice:

There are currently no trains between Durham and Berwick-upon-Tweed

A half hourly service is running between Berwick-upon-Tweed and Edinburgh
Journey times will be extended by up to 120 minutes

Newcastle station is also being affected by flooding. Northern Rail services may still call at the station, but will be delayed. Some East Coast and First TransPennine Express trains may not run between Durham and Newcastle

CrossCountry trains to / from Scotland will not run between Darlington and Scotland

East Coast are advising passengers travelling between York and Berwick-upon-Tweed not to travel


RE: East Coast - wirralbus - 23/10/2012 21:18

Due to major signalling problems between Peterborough and Grantham , services are meeting with delays of upto 90 minutes.


RE: East Coast - First Class - 23/10/2012 21:28

Line problems:
Down Fast Line out of use Tallington to Stoke due to defective signals
Temporary Block Working on Down Slow Line Tallington to Stoke due defective signals. Limits of TBW P577 (Little Bytham neutral section) to P613 (last signal on DSL)
TCF Newark Flat Crossing trains being cautioned

Late running services:
1E25 1450 Aberdeen to Kings Cross is running 17 minutes late
1E27 1830 Edinburgh to Kings Cross is running 10 minutes late
1S30 1830 Kings Cross to Edinburgh is running 51 minutes late
1D27 1833 Kings Cross to Bradford is running 51 minutes late
1S31 1900 Kings Cross to Edinburgh is running 86 minutes late
1D28 1903 Kings Cross to Leeds is running 110 minutes late
1N32 1930 Kings Cross to Newcastle is running 93 minutes late

Cancellations:
1D15 1305 Kings Cross to Leeds (set failure Kings Cross)
1A39 1545 Leeds to Kings Cross (set failure Kings Cross)
1D31 2005 Kings Cross to Leeds

Alterations:
1A50 1945 Leeds to Kings Cross: Terminate at Doncaster
1B90 1906 Kings Cross to Lincoln terminating at Newark


RE: East Coast - wirralbus - 23/10/2012 22:40

Seems that the signalling has gone completely on the Down side of the East Coast mainline (away from london).

Looking at the section that seems to have failed this could very well be a problem related to cables yet again , this area seems to be very prone to cable theft recenty.


RE: East Coast - First Class - 24/10/2012 00:08

(23/10/2012 22:40)wirralbus Wrote:  Seems that the signalling has gone completely on the Down side of the East Coast mainline (away from london).

Looking at the section that seems to have failed this could very well be a problem related to cables yet again , this area seems to be very prone to cable theft recenty.

Not cable theft...

It appears that we have been unlucky enough to be affected by two separate faults one affecting each line, there is a chance that a common cable links them, but they are being addressed separately.

S&T are making a cable bypass that should allow normal signalling on the Down Slow before long. TBW is in force on the DS to allow some movement of traffic, trains are queueing approx 90 minutes and then taking 20 to pass through the section.

There is also a TCF at Newark. Services to be cautioned on both the Down and Up lines.


RE: East Coast - childwallblues - 30/10/2013 08:25

91125 plus DVT 82216 plus its carriages have been given an overall advert for Sky HD.


RE: East Coast - childwallblues - 06/11/2013 09:02

A new footbridge with lift and step access is being built at the north end of Wakefield Westgate station. The barrow crossing at the south end of the station will no longer need to be used for wheelchairs, prams etc.


RE: East Coast - SLTRegular - 06/11/2013 15:32

Just being Pedantic Childwall but its for the Channel Sky1HD


RE: East Coast - childwallblues - 06/11/2013 20:31

(06/11/2013 15:32)SLTRegular Wrote:  Just being Pedantic Childwall but its for the Channel Sky1HD

Ah! Do not know what that is!