Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: Stagecoach Chester & Wirral
The revised X8 timetable (applicable from 29 May 2016) has now appeared on the Stagecoach website. Link here New X8 timetable Again, this version is different to that shown on the Merseytravel website in that their version shows all services calling at Chester Zoo. Also, the stopping points listed on the two versions are different - the Stagecoach version indicates that all stops on Long Lane (Upton) will also be served (handy for me). Grr...any wonder why people don't trust public transport to make effective use of it when two different bodies are saying different things about the same product...?? |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
Looking at the timetable and i cant see the X8 being able to keep to time, 1 hour 6 mins one way does not seem possible For Blog Posts Containing all the latest in the local Bus Scene The 2002 Bus Blog Subscribe to my Youtube Channel, Updated regularly! All my Social Media Links here! https://linktr.ee/TerencePrice |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
(17/05/2016 07:24)Turbostar Wrote: The revised X8 timetable (applicable from 29 May 2016) has now appeared on the Stagecoach website. Link here New X8 timetable Merseytravel showing the timetable for the benefit of passengers in Merseyside who are intending to use this service , CWAC should produce a timetable , do they though ? |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
(17/05/2016 07:24)Turbostar Wrote: The revised X8 timetable (applicable from 29 May 2016) has now appeared on the Stagecoach website. Link here New X8 timetable Also i have just noticed that the additional services between Chester Rail Station and Chester Zoo are dated as well |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
(17/05/2016 09:28)wirralbus Wrote: Merseytravel showing the timetable for the benefit of passengers in Merseyside who are intending to use this service , CWAC should produce a timetable , do they though ? As far as I know, CWAC only produce timetables for any subsidised services that operate in their area. They gave up printing timetables for other services some time ago. The differences between the timetables is that Stagecoach's shows some early morning/late evening services not calling at the Zoo whereas Merseytravel's version shows all services calling there. I'm inclined to take Stagecoach's version at face value as I can't see a lot of point in diverting into the Zoo at 06:20 in the morning. As regards timings, I think it will be very tight & i'm expecting some late running. We'll have to wait & see what happens when it all kicks off at the end of the month. Google maps shows the new route from Hoole roundabout to Cheshire Oaks as 0.9 miles further than using the motorway, and that's without the Zoo diversion. |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
There is swings and roundabouts on busier days coming in from Chester via Backford maybe quicker than the route via M53 junction which can become very congested. |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
It's been suggested by a source within the bus industry that the QBP on ticketing may be ending in September as Arriva intend withdrawing their services on route 2? If true, I assume Stagecoach would run the erstwhile Arriva services using the 2 spare Enviro 300's and by tightening up the diagrams so that routes 1 & 2 can inter-work throughout the day?. Does anyone know anything more about this? |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
(18/05/2016 07:16)Turbostar Wrote: It's been suggested by a source within the bus industry that the QBP on ticketing may be ending in September as Arriva intend withdrawing their services on route 2? If true, I assume Stagecoach would run the erstwhile Arriva services using the 2 spare Enviro 300's and by tightening up the diagrams so that routes 1 & 2 can inter-work throughout the day?. I'd heard something similar a while ago from a source at arriva, along with a few other surprising changes. I am no longer active on this forum. |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
(18/05/2016 08:19)R879 HRF Wrote: I'd heard something similar a while ago from a source at arriva, along with a few other surprising changes. It's interesting that Stagecoach have been able to take on Arriva on the Wirral, something that First never could do. Compare Stagecoach's presence there now with First's less than four years ago. |
||||||
|
||||||
RE: Stagecoach Chester & Wirral
Is it that Arriva want to concentrate on what they already do best and dump the routes that go furtherst from there depots , is this maybe getting ready for the slow moving buses bill. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 28 Guest(s)