Transport for Wales Rail
|
|
||||||
RE: Transport for Wales Rail
(25/02/2020 14:35)wirralbus Wrote: As of 1400 hrs , Network rail have now decided that the River severn has now reached a point at Shrewsbury where the water is now too high for trains to safely run over the bridge at the South end of shrewsbury station. I would have thought that the Aberystwyth trains would not be able to reach Shrewsbury as it would have to go over the bridge |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 29 Guest(s)