TransPennine Express
|
|
||||||
RE: First Transpennine Express
(09/08/2013 17:24)wirralbus Wrote:(09/08/2013 16:18)First Class Wrote: DfT plans to electrify Windermere branch. For £16m, I would say just electrification for now, cost seems a little high for 10 miles though, so possibly line speed enhancements connected with level crossing upgrades. You could do a few things like extend the platform at Windermere to accommodate longer trains, (Pendolinos/Charters etc). A Summer only daily London-Windermere service would be popular IMO, (divert one of the Lancaster terminators). If Windermere is planned, I assume Barrow-in-Furness must be getting considered too. Travel is glamorous only in retrospect. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 6 Guest(s)