Current time: 19/09/2024, 06:07 Hello There, Guest! (LoginRegister)

Post Reply 
Electrification - General
RE: Electrification - General
(28/10/2013 14:05)childwallblues Wrote:  
(26/10/2013 23:08)Metroline1511 Wrote:  Also, there is reference in Modern Railways of ScotRail planning for electrification of the Cumbernauld line in time for the Commonwealth Games next July. I believe they want the Whifflet branch electrified by then too.

Rutherglen to Whifflet is to be electrified by the same method as Paisley Canal.It is planned that services from Whifflet will run into Glasgow Central LL and continue to stations on North Clydeside.


I was recently in the Whifflet/Coatbridge area. Gantry work already very much in evidence towards Cumbernauld. This should ultimately form part of the Glasgow - Edinburgh via Falkirk wiring.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Electrification - General - DVG526 - 06/11/2013 19:53



User(s) browsing this thread: 1 Guest(s)