Greater Manchester Tenders
|
|
||||||
RE: Greater Manchester Tenders
(12/06/2014 17:14)jimbo Wrote: Nah, looks like I'm waiting for the next one to come out, i want to know how they are justifying the reduction in the 434, it is a very popular service they only cut subsidised buses if the patronage figure from data collectors and ticket machine data justifies it. if a service is at risk then they put data collectors on all subsidised journeys for a week to get an average passenger per trip if it falls in a certain % then its kept/cut dependant on the figures from data collected via the above means for eg the 217/8 had collectors on for 3 weeks around january and was cut in april as this was the 3rd highest tender (or something like that) plus if their is alterantive transport within approx 800metres (i think it is ) then they can cut/amend route as said in this from the report 451 Rochdale – Newhey – Peppermint Bridge First Manchester Service 451 operates hourly on Monday to Saturday daytime between Rochdale and Milnrow with the section between Milnrow and Peppermint Bridge provided with support from TfGM. TfGM officers recommend the withdrawal of the subsidy as part of required budgetary efficiency savings. First Manchester has indicated its intention to withdraw the commercial service with the exception of some peak journeys. There is an average number of 2.8 unique passengers affected per trip with a cost per passenger £4.63. Peppermint Bridge and Bentgate would be unserved Monday to Saturday daytime, a distance of just over 800 metres and just under 400 metres respectively to the nearest services. Kiln Lane area to be served by the revised route on service 462 (see separate report). Services 58 and 181 provide a combined 6 buses per hour along Milnrow Road and Rochdale Road. Evening and Sunday journeys are unaffected. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 3 Guest(s)