Virgin Trains
|
|
||||||
RE: Virgin Trains
(18/01/2016 02:02)wirralbus Wrote: Sounds like it could be around March / April time if that is the case .The weather was exceptionally bad when the problem occurred. I do not think that there have been previous problems with the viaduct so I doubt whether NR willbuild a new viaduct to replace it. All time rail mileage travelled 327264 miles |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 2 Guest(s)