Stagecoach MCSL - Gillmoss Depot
|
|
||||||
RE: Stagecoach Merseyside - Gillmoss Depot
(03/12/2016 08:47)gka472l Wrote: The timing would fit in with the Wirral line closure, although Arriva are doing that.....could they be sub-contracting some of it to Stagecoach....or could Stagecoach be enhancing capacity on their own cross-river routes for the duration of the Wirral line closure? An interesting one anyway....the MMC's still have to start operation in Cambridge in February and the Wirral line closure is 3/1 to 12/2. Not sure if this is true or not but ive been told that ARRIVA have the contact for the rail replacement work |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 35 Guest(s)