Liverpool Lime Street to get an overhaul
|
|
||||||
RE: Liverpool Lime Street to get an overhaul
(31/07/2018 07:45)mikestone Wrote: It was . The new 1 is the old 2, but out of use until October. Thanks Mike Seems a bit confusing,but then again it's network Fail we are talking about Cheers Rob Day Formerly 51537 |
||||||
|
||||||
RE: Liverpool Lime Street to get an overhaul
(31/07/2018 08:05)Penny Return Wrote: Thanks Mike It'll be confusing either way. To those new to Stockport station it wouldn't make sense why the numbering starts at zero not one or why a rarely used bay platform is 3A when it's completely separate to platform 3. Likewise at Huddersfield there's platform 8 and there's been plans to put in a platform 9 but there's no platform 3 or 7 due to 2 old bay platforms being removed. Even though retention of the old numbers at both Stockport and Huddersfield doesn't confuse passengers used to the stations. |
||||||
|
||||||
RE: Liverpool Lime Street to get an overhaul
I also found it strange that the old platform 1 was removed when they are wanting to accommodate more trains. |
||||||
|
||||||
|
||||||
RE: Liverpool Lime Street to get an overhaul
Viewed the new numbering of the platforms this afternoon 2 - 10 on a short trip out. Did not have a signal check on the way in coming back although it was off peak, let's hope it is assign of things to come with all the improvements Cheers Rob Day Formerly 51537 |
||||||
|
||||||
RE: Liverpool Lime Street to get an overhaul
Sorry... Platforms are 1-10 getting mixed up again with the old platform 2 now is 1 Cheers Rob Day Formerly 51537 |
||||||
|
||||||
RE: Liverpool Lime Street to get an overhaul
(31/07/2018 18:53)Penny Return Wrote: Sorry... Platforms are 1-10 getting mixed up again with the old platform 2 now is 1No Platforn 1 currently. All time rail mileage travelled 327264 miles |
||||||
|
||||||
RE: Liverpool Lime Street to get an overhaul
Having now seen the station on the ground the new platforms one and two now extend to the mouth of the short tunnel and if the old platform one had been retained obviously both it and the new number 1 would have been too short. What is perhaps surprising is that they didn't choose to relocate the booking office and extend towards the concourse |
||||||
|
||||||
RE: Liverpool Lime Street to get an overhaul
(01/08/2018 08:30)mikestone Wrote: Having now seen the station on the ground the new platforms one and two now extend to the mouth of the short tunnel and if the old platform one had been retained obviously both it and the new number 1 would have been too short. Relocate the booking office to where Burger King use to be? Thats the only place I can think of where thereād be room if not a little cramped |
||||||
|
||||||
RE: Liverpool Lime Street to get an overhaul
There are future plans to build a supermarket within the station by reducing the size of the travel centre and building into the staff car park on Lord Nelson street. The new first class lounge is set to open around the 20th of this month, at which point the temporary Virgin Trains lounge will be dismantled. The aim is for platforming to be kept reasonably simle now, with majority of Chat Moss line services being kept to platforms 1-5, with Cheshire/Ditton line services being kept to platforms 6-10. |
||||||