Current time: 18/12/2025, 15:19 Hello There, Guest! (LoginRegister)

Thread Closed 
Virgin Trains
RE: Virgin Trains
There will be the possibility of anglo Scottish services being diverted via Edge Hill instead of Manchester or Warrington , which gives some more operational flexability as well in the future
Find all posts by this user
RE: Virgin Trains
Just been watching Youtube and an Advert came up involving a Virgin Train on Platform 7 at Liverpool Lime Street

Content Creator, make sure to follow, Like and Subscribe!

https://linktr.ee/TerencePrice
Visit this user's website Find all posts by this user
RE: Virgin Trains
The problems at Warrington (noted in the ATW Thread) are also affecting Virgin services and there is a rail replacement bus / coach service in operation between Warrington and Wigan.
Find all posts by this user
RE: Virgin Trains
Times like these that the electrified Chat Moss route becomes very useful
Find all posts by this user
RE: Virgin Trains
I agree but some times if it isnt planned it just displaces staff which can cause more disruption when traincrew are no longer in the right place .

Everybody hates road replacement transport but sometimes its best for the operations staff .
Find all posts by this user
RE: Virgin Trains
Sounds like absolute chaos at Manchester Piccadilly tonight , with services stopping short at Stockport or Wilmslow , this is caused by OHLE fault .
Find all posts by this user
RE: Virgin Trains
(01/07/2015 17:56)wirralbus Wrote:  Sounds like absolute chaos at Manchester Piccadilly tonight , with services stopping short at Stockport or Wilmslow , this is caused by OHLE fault .
Not just Piccadilly.

All time rail mileage travelled 327264 miles
Find all posts by this user
RE: Virgin Trains
(02/07/2015 16:33)childwallblues Wrote:  Not just Piccadilly.

I agree it was more than just Piccadilly suffering yesterday but just that one incident at Slade Lane had repercussions in all directions , its a long time since i saw delays of such magnitude though.
Find all posts by this user
RE: Virgin Trains
(24/04/2015 05:13)childwallblues Wrote:  390050 is the first of the 21 x 9 car units to be modified to increase the standard class accommodation. First class carriage G has been downgraded to standard, fitted with 2+2 seating and re-lettered as carriage F. The work is being done at Oxley Depot and the unit is oos for a week.

Travelled on 390040 last week which has also been modified.

All time rail mileage travelled 327264 miles
Find all posts by this user
RE: Virgin Trains
(29/07/2015 07:09)childwallblues Wrote:  Travelled on 390040 last week which has also been modified.

There's at least 10 done, off the top of my head, 390016/20/40/42-47/49/50, think all to be done by September

HTH

https://www.flickr.com/photos/dmc1947/
Find all posts by this user
Thread Closed 




User(s) browsing this thread: 1 Guest(s)